Go back to the interactive dataset
2016 - C40 Cities, Projects in development, from CAM 3.0
| Row number | City short name | City name | Country | Region | Reporting year | Sector | Effective Action Area | What Scale and Status have you achieved for this action? | Action Description | Primary (major) financial mechanism | Total capital cost ($USD) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 451 | Quito | Distrito Metropolitano de Quito | Ecuador | Latin America | 2015 | Mass Transit | Still under consideration or awaiting final authorisation | Metrobus Q second and third fase implementation | |||
| 452 | Quito | Distrito Metropolitano de Quito | Ecuador | Latin America | 2015 | Waste | Currently in effect and being piloted | MDL methane capture on local landfills | |||
| 453 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Buildings | Energy efficiency/ retrofit measures | Currently in effect at a significant scale across most of the city | Incentives within green building regulation (Selo Verde) | Developer contributions | 5.000.001 - 10.000.000 |
| 454 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Buildings | Energy efficiency/ retrofit measures | Currently in effect at a significant scale across most of the city | Incentives within green building regulation (Selo Verde) | Developer contributions | 5.000.001 - 10.000.000 |
| 455 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Buildings | Energy efficiency/ retrofit measures | Currently in effect and being piloted | This initiative is being conducted by some city departments themselves and in partnership with the energy distribution company, which is required by national law to invest part of its revenue in energy efficiency projects. | City's own funds / savings | 100.001 - 250.000 |
| 456 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Outdoor Lighting | LED / CFL / other luminaire technologies | Still under consideration or awaiting final authorisation | Partnership with the World Bank in the development of a comprehensive study to assess technical and financing feasibility to change street lightning to LED. | Source pending identification/not yet determined | 10.000.001+ |
| 457 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | The Program of Reforestation Effort aims to contain the works of hillsides. | City's own funds / savings | 10.000.001+ |
| 458 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | The Program of Reforestation Effort aims to contain the works of hillsides. | City's own funds / savings | 10.000.001+ |
| 459 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect and being piloted | Environmental recovery program of the Canal do Mangue Basin: Works that will do the elimination of floods in the region of Praça da Bandeira, deploying tanks with water accumulation and construction of a diversion tunnel for Joana River. The reservoirs also serve as a great retainer of solid waste, which are transported by rivers, preventing their arrival at the Guanabara Bay. The works of "Porto Maravilha" predict dry weather stations that will lead to the wastewater treatment plant Joy, no longer contribute to the release of sewage in Guanabara Bay. | City's own funds / savings | 10.000.001+ |
| 460 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | The Program of Reforestation Effort aims to contain the works of hillsides. | City's own funds / savings | 10.000.001+ |
| 461 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | 12,973 families living in risk areas in 123 communities will be removed, thus, 119 slums will be eradicated. | City's own funds / savings | 10.000.001+ |
| 462 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | The Emergency Action Plan of Civil Defence aims to combat floods and is connected to the activities of the Rio Operations Center that are designed to neutralize and counter the impacts of climate change in the city of Rio de Janeiro. | City's own funds / savings | 10.000.001+ |
| 463 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Waste | Recycling or composting collections and/or facilities | Currently in effect at a significant scale across most of the city | In the implementation phase of the project of six triage centers for the City of Rio de Janeiro with total capacity of 150t per day; and expansion of the fleet of recyclable collection. | ||
| 464 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Waste | Landfill management | Still under consideration or awaiting final authorisation | Future project to convert the former Gramacho landfill in a park for the community. | ||
| 465 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | With The Water for All Program of Nova Cedae the communities have a specific project that includes the renovation of reservoirs and pumping with remote monitoring, repairing leaks, installing water boxes of 500 liters; identification of households using street name and numbering; implementation of macrometers to calculate the total consumption, and registration for delivery of accounts with social tariff. Residents also receive guidance from a multidisciplinary team - comprised of teachers, social workers and psychologists - on the rational use of water and waste water. In addition of bringing quality of life, health and comfort to the population, these actions are enabling the company to increase revenue and reduce delinquencies, which reached 75% in some regions. | City's own funds / savings | 10.000.001+ |
| 466 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Buildings | Energy efficiency/ retrofit measures | Still under consideration or awaiting final authorisation | Partnership with the World Bank to develop a comprehensive assessment of the energy consumption in the public buildings (schools and hospitals first) and evaluation of feasible technical and financing solutions to increase energy efficiency. | Source pending identification/not yet determined | |
| 467 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Food and Agriculture | Encourage sustainable food production and consumption | Currently in effect and being piloted | Pilot community gardens have been developed with cooperation of the Prefeitura, non-profit organizations Ministry of Social Development. . | City's own funds / savings | |
| 468 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Mass Transit | Improve bus infrastructure, services, and operations | Currently in effect at a significant scale across most of the city | 24-hour BRT Operation | ||
| 469 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Mass Transit | Improve bus infrastructure, services, and operations | Currently in effect at a significant scale across most of the city | Implementation of BRT systems (Bus Rapid Transit) Transoeste, TransCarioca, TransOlímpica - BNDES financing / consortium | ||
| 470 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Mass Transit | Improve bus infrastructure, services, and operations | Currently in effect at a significant scale across most of the city | BRT system and BRS system will have improved bus shelters with confort and technology | Source pending identification/not yet determined | |
| 471 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Mass Transit | Improve fuel economy and reduce CO2 from bus and/or light rail | Still under consideration or awaiting final authorisation | The City of Rio participates in hybrid and electric buses with C40 with support of IDB | ||
| 472 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Mass Transit | Improve fuel economy and reduce CO2 from bus and/or light rail | Still under consideration or awaiting final authorisation | Increase the vehicles with hybrid vehicles. | ||
| 473 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Mass Transit | Smart public transport | Currently in effect at a significant scale across most of the city | Rio de Janeiro has the Project Bike Rio | Developer contributions | |
| 474 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Outdoor Lighting | Smart lighting | Currently in effect and being piloted | Instalation of sollar pannels on some areas | ||
| 475 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Outdoor Lighting | Smart lighting | Currently in effect at a significant scale across most of the city | Modernizing lighting system in the city | ||
| 476 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Private Transport | Improve fuel economy and reduce CO2 from motorized vehicles | Still under consideration or awaiting final authorisation | |||
| 477 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Private Transport | Improve fuel economy and reduce CO2 from motorized vehicles | Currently in effect and being piloted | We recently have implementing a pilot program for electric taxi cabs in the city | ||
| 478 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Private Transport | Infrastructure for non motorized transport | Currently in effect at a significant scale across most of the city | The city holds 53 guard stations and bicycle loan. Nowadays, there are 600 bicycles available for rent. | ||
| 479 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Private Transport | Infrastructure for non motorized transport | Currently in effect and being piloted | The city seeks greater integration of transport modes installing bike racks in metro stations and elsewhere in the city. | ||
| 480 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Private Transport | Infrastructure for non motorized transport | Currently in effect and being piloted | Very few are shared lanes. | ||
| 481 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Private Transport | Infrastructure for non motorized transport | Currently in effect at a significant scale across most of the city | The city is expading public information to stimulate walking | ||
| 482 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Waste | Recycling or composting collections and/or facilities | Currently in effect and being piloted | Future project for composting and fertilizer manufacturing through waste of CEASA. | ||
| 483 | Salvador | City of Salvador | Brazil | Latin America | 2015 | Waste | Recyclables and organics separation from other waste | Currently in effect and being piloted | Municipal program of selective collection, the campaign of selective collection, availability of delivery points voluntary recyclable materials - ENP, among others. | Loans | 10.000.001+ |
| 484 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Water | Wastewater to energy initiatives | Currently in effect at a significant scale across most of the city | Are being built collectors trunk to forward the sewage, that were previously released in the ponds, to the new submarine emissary (Barra da Tijuca). Is also being built a new sewerage for the Northern District, the sewage will be treated in the ETE Alegria, the largest sewage treatment plant in Rio de Janeiro, which operates today 1300 l/s, but is licensed to treat 7500 l/s. | City's own funds / savings | |
| 485 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Water | Wastewater to energy initiatives | Currently in effect and being piloted | The Methane Recovery Project conducted in partnership with COPPE / UFRJ, consists in the use of biogas resulting from the anaerobic digestion of sludge segregated from the aqueous fraction of ETE Alegria. Biogas passes through a treatment to fit the usage patterns desired for power generation. This process is economically feasible to the station, 33% of the energy is used in the same, this project also promotes the reduction of its emissions. | City's own funds / savings | |
| 486 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Water | Wastewater to energy initiatives | Currently in effect and being piloted | Projects - Wastewater for power generation Biofuel production using material from the grease trap is the use of material removed by trucks "papa-fossas" of boxes of fat, which is released in ETE Alegria, as a source of biofuels. For this, the demulsification of fat occurs, processing and biodiesel production, aiming its use in power generation, so associated with biomethane. Biofuel production using scum consists in use and reuse of scum (consisting of water-insoluble organic material) which appears as supernatant in which the operation is subjected sewer primary (swimming ponds) ETE Alegria. The foam is used as starting material to test and refine on a pilot installation, the catalytic esterification technology for obtaining biodiesel, which has lower emissions than diesel conventionally used. | ||
| 487 | Rio de Janeiro | Prefeitura do Rio de Janeiro | Brazil | Latin America | 2015 | Water | Water recycling and reclamation | Still under consideration or awaiting final authorisation | There will be recycling 1700 l/s of water from the sewage treatment ETE Alegria to the steel complex COMPERJ. Today ETE Penha already recycles ?? l/s to wash the streets (agreement with COMLURB), final cleaning street fairs and watering parks and gardens in the city. | ||
| 488 | Rome | Roma Capitale | Italy | Europe | 2015 | Energy Supply | Low or zero carbon energy supply generation | Currently in effect and being piloted | |||
| 489 | Rome | Roma Capitale | Italy | Europe | 2015 | Energy Supply | Smart grid | Currently in effect and being piloted | |||
| 490 | Rome | Roma Capitale | Italy | Europe | 2015 | Mass Transit | Improve fuel economy and reduce CO2 from trucks | Currently in effect and being piloted | |||
| 491 | Rome | Roma Capitale | Italy | Europe | 2015 | Private Transport | Transportation demand management | Currently in effect and being piloted | |||
| 492 | Rome | Roma Capitale | Italy | Europe | 2015 | Adaptation | None | Currently in effect and being piloted | |||
| 493 | Rotterdam | Gemeente Rotterdam | Netherlands | Europe | 2015 | Buildings | On-site renewable energy generation | Currently in effect and being piloted | Aiming to have 10.000 extra roofs with solar electricity in 2018 | ||
| 494 | Rotterdam | Gemeente Rotterdam | Netherlands | Europe | 2015 | Finance and Economic Development | Developing the green economy | Currently in effect and being piloted | |||
| 495 | Rotterdam | Gemeente Rotterdam | Netherlands | Europe | 2015 | Adaptation | None | Currently in effect at a significant scale across most of the city | Increase of water storage (watersquares, green roofs 40,000 square meters per year); in general incorporating the built environment in solutions for water storage and water protection besides enhancing the watermanagement system. | City's own funds / savings | |
| 496 | Salvador | City of Salvador | Brazil | Latin America | 2015 | Buildings | Energy efficiency/ retrofit measures | Still under consideration or awaiting final authorisation | Development of a municipal administrative center, gathering all public organizations, being water and energy eco-efficient. | Loans | 500.001 - 1.000.000 |
| 497 | Salvador | City of Salvador | Brazil | Latin America | 2015 | Outdoor Lighting | LED / CFL / other luminaire technologies | Currently in effect and being piloted | Part of the public lighting of the city is being replaced by LED lamps. | City's own funds / savings | 500.001 - 1.000.000 |
| 498 | Salvador | City of Salvador | Brazil | Latin America | 2015 | Mass Transit | Improve fuel economy and reduce CO2 from bus and/or light rail | Currently in effect at a significant scale across most of the city | New bus system with using less fuel pollutants | Loans | 500.001 - 1.000.000 |
| 499 | Salvador | City of Salvador | Brazil | Latin America | 2015 | Mass Transit | Improve rail, metro, and tram infrastructure, services and operations | Currently in effect and being piloted | Expansion of Metro lines, connection with BRT lines. | Loans | 500.001 - 1.000.000 |
| 500 | Salvador | City of Salvador | Brazil | Latin America | 2015 | Mass Transit | Improve fuel economy and reduce CO2 from trucks | Currently in effect and being piloted | New energy matrix in city mode of transport, with presentation of new buses, rationalization of routes, implementation of exclusive lanes. | Loans | 10.000.001+ |
About
This information is now on Primer
All the information that is in this pane, and more, is now on Primer, in a more consumable and user friendly format. You can also edit metadata from this page.
Take me there!
Description
Publicly reported projects in development across C40 cities from the CAM (Climate Action in Megacities) 3.0 study undertaken by C40 and Arup, supported by the City Leadership Initiative at UCL.
View the full report here: https://www.cdp.net/en/reports/downloads/1880
Please see the 'Terms of Use' to learn more about information about our Terms & Conditions.
Activity
- Community Rating
-
Current value: 0 out of 5
- Raters
- 0
- Visits
- 568
- Downloads
- 125
- Comments
- 0
- Contributors
- 0
Meta
- Category
- Opportunities
- Permissions
- Public
- Tags
- 2016, c40, economy, economic opportunities, climate action, climate change
- Row Label
- SODA2 Only
- Yes
Licensing and Attribution
- Data Provided By
- (none)
- Source Link
- (none)
License Type
- License Type
- CDP Open Database License
