Go back to the interactive dataset

Final WWF One Planet City Challenge 2021 Data

Row numberAccount NumberAccount NameCountryCDP RegionParent SectionQuestion NumberQuestion NameColumn NumberColumn NameRow NumberRow NameResponse AnswerCommentsFile Name
15000173752Bontang CityIndonesiaSoutheast Asia and Oceania8.1aPlease indicate the source mix of thermal energy (heating and cooling) consumed in your city.9Total (auto-calculated)1Thermal energy consumption
15000273752Bontang CityIndonesiaSoutheast Asia and Oceania8.1aPlease indicate the source mix of thermal energy (heating and cooling) consumed in your city.10Total consumption (MWh)1Thermal energy consumption
15000373752Bontang CityIndonesiaSoutheast Asia and Oceania8.1aPlease indicate the source mix of thermal energy (heating and cooling) consumed in your city.11Year data applies to1Thermal energy consumption
15000473752Bontang CityIndonesiaSoutheast Asia and Oceania8.1aPlease indicate the source mix of thermal energy (heating and cooling) consumed in your city.12What scale is the thermal energy mix data1Thermal energy consumption
15000573752Bontang CityIndonesiaSoutheast Asia and Oceania8.1aPlease indicate the source mix of thermal energy (heating and cooling) consumed in your city.13Comment1Thermal energy consumption
15000673752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)1Solar PV
15000773752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)2Solar thermal
15000873752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)3Hydro power
15000973752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)4Wind
15001073752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)5Bioenergy (Biomass and Biofuels)
15001173752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)6Geothermal
15001273752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).1Installed capacity (MW)7Other, please specify
15001373752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)1Solar PV
15001473752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)2Solar thermal
15001573752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)3Hydro power
15001673752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)4Wind
15001773752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)5Bioenergy (Biomass and Biofuels)
15001873752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)6Geothermal
15001973752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).2Annual generation (MWh)7Other, please specify
15002073752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to1Solar PV
15002173752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to2Solar thermal
15002273752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to3Hydro power
15002373752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to4Wind
15002473752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to5Bioenergy (Biomass and Biofuels)
15002573752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to6Geothermal
15002673752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).3Year data applies to7Other, please specify
15002773752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment1Solar PV
15002873752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment2Solar thermal
15002973752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment3Hydro power
15003073752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment4Wind
15003173752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment5Bioenergy (Biomass and Biofuels)
15003273752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment6Geothermal
15003373752Bontang CityIndonesiaSoutheast Asia and Oceania8.2For each type of renewable energy within the city boundary, please report the installed capacity (MW) and annual generation (MWh).4Comment7Other, please specify
15003473752Bontang CityIndonesiaSoutheast Asia and Oceania8.3Does your city have a target to increase energy efficiency?0Intending to undertake in the next 2 yearsThe Bontang City Government in 2016 has utilized methane gas generated from the process of decaying waste in the Bontang Lestari landfill as a gas stove fuel.Methane gas is flowed through a pipeline in 75 families located in Baltim Bontang Lestari.
15003573752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.1Electrification ratio of the city1Energy access100
15003673752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.2Average electricity consumption per commercial establishment (MWh/annum)1Energy access
15003773752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.3Average electricity consumption per residential household (MWh/annum)1Energy access
15003873752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.4Average unit price of electricity (Currency unit as specified in 0.4/MWh)1Energy access
15003973752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.5Percentage of electricity distributed, but not billed1Energy access
15004073752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.6Percentage of city population with access to clean cooking1Energy access100
15004173752Bontang CityIndonesiaSoutheast Asia and Oceania8.4Please report the following energy access related information for your city.7Comment1Energy access
15004273752Bontang CityIndonesiaSoutheast Asia and Oceania8.5How many households within the municipal boundary face energy poverty? Please select the threshold used for energy poverty in your city.1Number of households within the city boundary that face energy poverty1Energy Poverty
15004373752Bontang CityIndonesiaSoutheast Asia and Oceania8.5How many households within the municipal boundary face energy poverty? Please select the threshold used for energy poverty in your city.2Threshold used for energy poverty1Energy Poverty
15004473752Bontang CityIndonesiaSoutheast Asia and Oceania8.5How many households within the municipal boundary face energy poverty? Please select the threshold used for energy poverty in your city.3Comment1Energy Poverty
15004573752Bontang CityIndonesiaSoutheast Asia and OceaniaResponse LanguageWhat language are you submitting your response in?0English
1500462185Bristol City CouncilUnited Kingdom of Great Britain and Northern IrelandEurope0.1Please give a general description and introduction to your city including your city’s reporting boundary in the table below.1Administrative boundary1Please completeCity / Municipality
1500472185Bristol City CouncilUnited Kingdom of Great Britain and Northern IrelandEurope0.1Please give a general description and introduction to your city including your city’s reporting boundary in the table below.2Description of city1Please completeBristol is a medium sized city situated in the South West of England, set on the banks of the tidal River Avon. There are many things that set Bristol apart and make it a place where an increasing number of people want to live, work and study. In fact, Bristol’s population is increasing at a higher rate than other similar UK cities with its wealth of culture, creativity and easy access to other places appealing to many. Bristol is now a truly global city and is home to a unique mix of cultures and ideas with at least 91 different languages spoken.Bristol is a leading green city in a UK and European context. For example Bristol was the first city in the UK to develop and implement a climate strategy in 2004 and to declare a Climate Emergency in 2018. Bristol was the European Green Capital 2015, the only UK city to achieve this recognition.Our reporting boundary is the same as the city boundary.
1500482185Bristol City CouncilUnited Kingdom of Great Britain and Northern IrelandEurope0.2If you have not previously submitted your Letter of Commitment to the Global Covenant of Mayors, either through the relevant regional covenant or through the Global Covenant secretariat, please attach the letter signed by an appropriately mandated official (e.g. Mayor, City Council) to this question.0
1500492185Bristol City CouncilUnited Kingdom of Great Britain and Northern IrelandEurope0. Introduction0.3Please provide information about your city’s Mayor or equivalent legal representative authority in the table below.1Leader title1Please completeMayor of Bristol
1500502185Bristol City CouncilUnited Kingdom of Great Britain and Northern IrelandEurope0. Introduction0.3Please provide information about your city’s Mayor or equivalent legal representative authority in the table below.2Leader name1Please completeMarvin Jonathan Rees

About

Profile Picture Amy Bills

created Dec 14 2021

updated Dec 14 2021

Description

This dataset contains the complete responses of cities that participated in WWF's One Planet City Challenge in 2021.

Activity
Community Rating
Current value: 0 out of 5
Raters
0
Visits
56
Downloads
10
Comments
0
Contributors
0
Meta
Category
(none)
Permissions
Public
Tags
Row Label
SODA2 Only
Yes
Licensing and Attribution
Data Provided By
(none)
Source Link
(none)
License Type
License Type
CDP Open Database License

Filter

  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;

Sort

  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;
  • ;

Search

Post a Comment

Comments

  • Total Comments: 0
  • Average Rating: 0.0

Sharing

This dataset is public

Publishing

See Preview